Design-Build

Integrated design & construction under one contract

Accelerated schedules & cost certainty

Ideal for clients needing single-point of accountability

2000+

projects completed

Failure-free

construction delivery

no lost-time

incidents reported

EMR 0.67

Industry-leading safety rating (2004)

LEAN Fast-Track Design-Build

We accelerate delivery with design-build, Progressive DB, IPD, and lean systems engineered for speed, alignment, and predictable outcomes.

  • DB is 23% faster than CMAR
  • DB is 33% faster and 6% cheaper than DBB
  • Lean-driven project execution
  • Progressive and integrated delivery experience
  • Full matrix of sophisticated contracting methods

Lean delivery in action

Lean Project Delivery Goals
  • Optimize Process
  • Generate Value
  • Flexible & Eliminate Waste
  • Focus on Flow
  • Continuously Improve
Lean Outcomes
  • Customer satisfaction
  • Improve project delivery
  • Hit budget
  • Aligned Team
  • Future-Proofing

Trusted by